- Write by:
-
Friday, January 17, 2020 - 12:45:00 PM
-
860 Visit
-
Print
Mining News Pro - Taseko Mines has completed a new development plan and updated study for its Yellowhead copper project, 150 km northeast of Kamloops, British Columbia, adding 100 million tonnes to reserves and improving the economics.
According to Mining News Pro - A new technical report pegs pre-production capital costs for an operation with a 25-year mine life at Yellowhead at C$1.3 billion. At an 8% discount rate, the project has a pre-tax net present value (NPV) of C$1.3 billion and an internal rate of return (IRR) of 18%.
The project contains updated reserves of 817 million tonnes grading 0.29% copper equivalent (or 0.28% copper, 0.03 g/t gold and 1.3 g/t silver). The study used a long-term metal price of $3.10 per lb. copper and a $0.80 exchange rate.
In a release, Taseko CEO Russell Hallbauer noted that the updated report improves NPV by C$500 million over a 2014 feasibility study completed by the project’s previous owner, Yellowhead Mining.
“The optimizations and modifications we have made are not only beneficial to the economics of the project but will also improve it from an environmental assessment process standpoint,” Hallbauer said. “The leverage this mine has to metal prices is huge, and with only a 10% increase in these assumptions, the pre-tax NPV climbs to C$2 billion.”
The company now plans a 90,000 t/d operation, up from 70,000 t/d. The new technical report also features an improved water management plan that reduces stored water by 90%.
“While our primary and near-term focus will remain on the advancement of our Florence copper project through to production, we will continue to progress Yellowhead expeditiously as the timing will fit in ideally after Florence copper achieves commercial production,” Hallbauer said. “With the new technical report now complete, our efforts will focus on environmental assessment work, ongoing engagement with local communities.”
Taseko also owns the operating Gibraltar mine and is advancing the Florence copper project in Arizona. In December, it announced it was in talks with the Tsilhqot’in First Nation, mediated by the province, regarding its New Prosperity project in B.C.
Taseko acquired Yellowhead in 2014 in an all-stock transaction valued at C$13 million.
Short Link:
https://www.miningnews.ir/En/News/474236
Chinese carmaker BYD Co has postponed plans to produce lithium cathodes for electric vehicle (EV) batteries in Chile by ...
Copper futures in New York rallied to a record high after a short squeeze that’s prompted a scramble to divert metal in ...
China’s CMOC Group Ltd. is being accused by a top US official of using “predatory” tactics to depress prices of a key ...
A Native American group said on Tuesday it will take its fight against Rio Tinto’s proposed Arizona copper mine to the ...
Teck Resources Ltd expects to generate annual earnings before interest, depreciation, tax and amortization (EBITDA) of ...
The world’s largest zinc smelter is planning to significantly expand its copper output, taking advantage of growth ...
The state-run Chilean Copper Commission (Cochilco) will soon revise its copper price outlook, which will be considerably ...
Chilean mining giant Codelco is still working to meet its estimated output for the second quarter, CEO Ruben Alvarado ...
Australian-based Atlantic Lithium Ltd., which is developing Ghana’s first lithium mine, has taken a step toward raising ...
No comments have been posted yet ...