According to Mining News Pro - Excellent results came from hole EM-18-PP-331 that intersected 10.23% zinc and 9.19% lead over 13.1 metres and hole EM-18-PP-209 intersected 9.60% zinc and 1.53% lead over 13.5 metres.Notable assays were also received from hole EM-18-PP-211 that cut 20.28% zinc and 5.92% lead over 6.0 metres and hole EM-18-PP-351 WITH11.62% zinc and 2.50% lead over 10.0 metres.Osisko gave an initial 2018 inferred resource of 38.4 million tonnes grading 4.58% zinc and 1.855 lead. The current drill program will convert unclassified, near surface historical mineralization into the current resources and to locally extend known zones of mineralization.